Client:

ASFINAG- Highway and expressway finance public company ltd.

Total costs:

approx. 365 Mio. EUR

Performance period:

1998 – 2006

Data/Structures:

  • 14.6 km Expressway
  • Tunnel Spital, length = 2,600 m
  • Tunnel Steinhaus, length = 2,900 m
  • Tunnel Semmering, length = 3,500 m
  • Bridge over the old Reichsstraße, length = 179.60 m
  • Bridge over the main road B306, length = 117.40 m
  • Steinbach bridge, length = 28.18 m
  • Hintermüllerbach bridge, length = 14.16 m
  • Grabenbach bridge, length = 27.87 m

IBK-Services:

  • Accompanying inspection during the tender- and construction phase(Comprehensive and extensive inspections, consulting and documentation in terms of dates, costs and quality)