Client:

General Desalination Company of Libya (GDCOL)

Total costs:

n.d.

Performance period:

2010 – 2011

Data/Structures:

  • Desalination Technology:   Seawater Reverse Osmosis (SWRO)Desalination Capacity:   40,000m³/day

IBK-Services:

  • Review of Tender Documents
  • Proposal evaluation
  • Clarifications
  • Final proposal evaluation and evaluation report
  • Study of the existing technical specifications and drafting of the
    proposed changes
  • Internal review meeting and internal approval of the proposed changes
  • Issuing the package to GDCOL
  • Presentation and discussion with GDCOL and final approval.
  • Scope of Work:
    Technical evaluation and clarification of EPC (Engineering Procurement and Construction) contractors´ proposals submitted to GDCOL in course of the project. The results of the technical proposal evaluation and clarification process have been summarized and delivered in form of a proposal evaluation report, recommending the preferred bidders and providing a summary of key findings during the evaluation phase.
    Harmonization of the existing technical specification issued to the bidders.