Client:
General Desalination Company of Libya (GDCOL)
Total costs:
n.d.
Performance period:
2010 – 2011
Data/Structures:
- Desalination Technology: Seawater Reverse Osmosis (SWRO)Desalination Capacity: 40,000m³/day
IBK-Services:
- Review of Tender Documents
- Proposal evaluation
- Clarifications
- Final proposal evaluation and evaluation report
- Study of the existing technical specifications and drafting of the
proposed changes - Internal review meeting and internal approval of the proposed changes
- Issuing the package to GDCOL
- Presentation and discussion with GDCOL and final approval.
- Scope of Work:
Technical evaluation and clarification of EPC (Engineering Procurement and Construction) contractors´ proposals submitted to GDCOL in course of the project. The results of the technical proposal evaluation and clarification process have been summarized and delivered in form of a proposal evaluation report, recommending the preferred bidders and providing a summary of key findings during the evaluation phase.
Harmonization of the existing technical specification issued to the bidders.