Client:
MAPA (National Water Company / NWC, Saudi Arabia)
Total costs:
160 Mio. EUR
Performance period:
2014 – ongoing
Data/Structures:
- Briman Strategic Storage Reservoirs Phase 2 Project:
- 6 Steel Tanks with a total capacity of 1.020.000m³
- Tank Diameter / Height: 110m / 18.70m
- Makkah Al Mukarramah Strategic Storage Reservoir Station:
- 4 Steel Tanks with a total capacity of 760.000m³
- Tank Diameter / Height: 110m / 21m
- Makkah Al Haram Expansion Tank Station – Lot #2
- 4 Steel Tanks with a total capacity of 560.000m³
- Tank Diameter / Height: 100m / 19m
IBK-Services:
- System engineering – hydraulic and operation philosophy
- Piping design for process piping at the stations
- Design of connection to existing piping system
- Pipeline engineering
- Station layout design
- Tank foundation design
- Civil detail design
- Mechanical detail design