Client:

MAPA (National Water Company / NWC, Saudi Arabia)

Total costs:

160 Mio. EUR

Performance period:

2014 – ongoing

Data/Structures:

  • Briman Strategic Storage Reservoirs Phase 2 Project:
    • 6 Steel Tanks with a total capacity of 1.020.000m³
    • Tank Diameter / Height: 110m / 18.70m
  • Makkah Al Mukarramah Strategic Storage Reservoir Station:
    • 4 Steel Tanks with a total capacity of 760.000m³
    • Tank Diameter / Height: 110m / 21m
  • Makkah Al Haram Expansion Tank Station – Lot #2
    • 4 Steel Tanks with a total capacity of 560.000m³
    • Tank Diameter / Height: 100m / 19m

IBK-Services:

  • System engineering – hydraulic and operation philosophy
  • Piping design for process piping at the stations
  • Design of connection to existing piping system
  • Pipeline engineering
  • Station layout design
  • Tank foundation design
  • Civil detail design
  • Mechanical detail design