Client:

ASFINAG – Highway and expressway finance public company ltd

Total costs:

approx. 160 Mio. EUR

Performance period:

10/2013 – 06/2018

Data/structures:

  • Tunnel length = 15,564 m;
  • Avalanche gallery St. Jakob, Concrete Construction and avalanche gallery Langen: 1,592m
  • South tube: tunnel length with closed construction method: 13,972m

IBK-Services:

  • Site supervision and project coordination

K764_Bild 1

K764_Bild 2