Client:
ASFINAG – Highway and expressway finance public company ltd
Total costs:
approx. 160 Mio. EUR
Performance period:
10/2013 – 06/2018
Data/structures:
- Tunnel length = 15,564 m;
- Avalanche gallery St. Jakob, Concrete Construction and avalanche gallery Langen: 1,592m
- South tube: tunnel length with closed construction method: 13,972m
IBK-Services:
- Site supervision and project coordination