Client:

STRABAG – Road construction company ltd

Total costs:

approx. 400.000 EUR

Performance period:

2012 – 2017

Data/Structures:

  • Construction of a long-distance heating transport pipe
    DN 200 – DN 500, total length about 6.0 km
  • Accompanying installation of a natural gas – pipeline
  • Accompanying installation of 20 KV pipelines
  • Accompanying installation of empty ducts
  • Preparation of two tube presses DN 800
  • Preparation of 16 shafts and one pipe bridge across the river Glan

IBK-Services:

  • Permit application design construction section 2A, 2B and 2B1
  • Implementation planning construction section 2A, 2B and 2B1
  • Legal procedures and approvals
  • Traffic concepts for construction
  • Statically constructive treatment of shafts and special buildings (tube presses)
  • Approval and documentation
  • Technical site supervision, constructional part