Client:

ÖBB – Austrian Federal Railways

Total costs:

approx. 700 – 1.000 Mio. EUR

Performance period:

2003 – 2006

Data/Structures:

  • 50 km High-Capacity-Railway
  • Tunnel Wörhter See North, L = 19,272 m
  • Tunnel Pörtschach, L = 1,580 m
  • Drau bridge, L = 530 m

IBK-Services:

  • Project Management
  • Line selection
  • Study of alternatives
  • Conceptual Design
  • Design for the environmental impact declaration
  • Detail design

K368_Bild 1

K368_Bild 2