Client:
ÖBB – Austrian Federal Railways
Total costs:
approx. 700 – 1.000 Mio. EUR
Performance period:
2003 – 2006
Data/Structures:
- 50 km High-Capacity-Railway
- Tunnel Wörhter See North, L = 19,272 m
- Tunnel Pörtschach, L = 1,580 m
- Drau bridge, L = 530 m
IBK-Services:
- Project Management
- Line selection
- Study of alternatives
- Conceptual Design
- Design for the environmental impact declaration
- Detail design